Goodman Chullora

Goodman Chullora NSW

Client: Mainbrace, Goodman

Completion: Ongoing

Time Period: April 2025 - Current

Value: $1,500,000.00

Scale: 8,000m2

Sector: Industrial

This project for Mainbrace and Goodman involved converting an existing warehouse into a new and improved warehouse, including a hydrualic loading docks, drive-through services and speciality spaces.

The scope of works included:

  • Erosion and sediment control
  • Demolition of existing structures
  • Site clearance
  • Bulk earthworks
  • Detail excavation for building footings and retaining walls
  • Piling for building structures
  • Installation of light-duty asphaltic pavement
  • Installation of pedestrian footpath pavement
  • Installation of driveway pavement
  • Kerb only, kerb and gutter, integral kerb
  • Stormwater including pipe and pit installation
  • Electrical trenching
  • Linemarking and wheelstops